| Economic Threshold: Thrips populations are more prevalent during dry periods, and populations can be reduced by rainfall or sprinkler irrigation. Little work has been done to establish treatment thresholds for thrips. Onion thrips: Consider treatment if there are more than 15 thrips per plant and damage (cupping of the leaves) is observed. Western flower thrips: Five thrips per blossom can reduce pod numbers on the plant; however, economic losses may not occur until greater thrip numbers are reached. |
This list is not inclusive. See http://www.greenbook.net
or other resources for additional registrations.
This information is presented in abbreviated form. Be sure to consult the label
for additional information and restrictions.
View this file in Acrobat PDF format![]()
![]()
| IRAC Mode of Action Classification: | ||||
|
||||
| R = Restricted-Use Product | * = Suitable for chemigation | ai = active ingredient | REI = Re-Entry Interval | |
| PHI = Pre harvest interval | ||||
| Mode of Action |
Product Name |
Common Name |
Rate Formulation/Acre (unless otherwise noted) |
Restrictions/Comments |
|---|---|---|---|---|
| 1B R | Di-Syston 15% Di-Syston 8 |
disulfoton | 15%: 6 - 12 oz/1000 ft 8: 0.9 - 1.9 oz/1000 ft |
Apply at planting or post emergence side dress. PHI 60 days. REI 72 hrs. |
| 5 R | Entrust | spinosad | 1.5 - 2 oz | PHI 3 days. REI 4 hrs. |
| 1A R | Lannate SP, LV |
methomyl | SP: 0.5 - 1 lb LV: 1.5 - 3pts |
PHI 14 days. REI 48 hrs. |
| 3 R | Mustang, Fury |
zeta-cypermethrin | 3.4 - 4.3 oz | PHI 21 days. REI 12 hrs. |
| 1B R | Orthene, Acephate 75 (multiple formulations) |
acephate | 0.5 - 1 lb ai see label for rates |
PHI 14 days. REI 24 hrs. |
| 1A | Sevin* (multiple formulations), Carbaryl 4L* |
carbaryl | 1 lb ai see label for rates |
PHI 21 days. REI 12 hrs. |
| 5 R | SpinTor 2SC Success |
spinosad | 4.5 - 6 oz | PHI 28 days. REI 4hrs. |
| 1B R | Phorate 20G Thimet 20G |
phorate | 4.5 - 7 oz/1000 ft | Apply at planting. PHI 60 days. REI 72 hrs. |